Kontron IP Network Server NSC2U
December 2009 Product Guide, rev. 1.4
45
Server Component Installations and Upgrades—NSC2U Server
4. Open the socket by pushing the lever handle down and away from the socket to
release it. (“A” and “B” in Figure 27)
5. Pull the lever and open the load plate all the way. (“A” and “B” in Figure 28)
6. Remove the processor.
3.4.5.3 Installing a New Processor
Note: Follow the ESD precautions covered in Section 3.4.5.1.
To install a processor, follow these instructions:
1. Take the processor out of its packaging and remove the protective shipping cover.
(“A”)
Figure 27. Using the Socket Lever
Figure 28. Opening the Load Plate